CTECP
Field crews · hourly

Concrete Foreman — Foundations, Slabs & Paving

Full-time · hourlyUnited States · project siteStart: Rolling — interviewing now

About the role

Lead crews placing spread footings, equipment foundations, industrial slabs and heavy-duty paving — layout, forms, rebar, pours, finishing and curing.

What you'll do

  • Coordinate pours with the superintendent, pump and ready-mix suppliers and the testing lab.
  • Supervise formwork, rebar, embeds and anchor-bolt templates; check elevations and floor-flatness requirements.
  • Run finishing crews, jointing, curing and protection.

What you bring

  • 8+ years commercial/industrial concrete, 3+ years as foreman on large slabs or paving.
  • Reads structural drawings; laser or total-station layout experience.
  • OSHA 30 preferred; bilingual English/Spanish; authorized to work in the US.

Nice to have

  • Laser-screed experience.
  • ACI Flatwork Finisher certification.
Pay: competitive, based on experience. Hourly roles: overtime per FLSA; PPE provided.
Openings are tied to project schedules and may be contingent on contract award; we are interviewing now.

CTECP INC is an equal opportunity employer. All qualified applicants receive consideration without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability or veteran status. Applicants must be authorized to work in the United States; we complete Form I-9 for every hire. Visa sponsorship is not available for these positions. Pre-employment drug screening and background checks may be required by project-site rules.

Field crews · hourly