CTECP
Now hiring · United States

Build a new industrial campus in the United States with us.

CTECP INC is building its U.S. project team, field crews and licensed-subcontractor bench for upcoming industrial construction work. Project, field and subcontractor openings below.

📍 Houston, Texas · Dallas, Texas · Greenville, South Carolina · Monterrey & Puebla, MexicoRolling — interviewing nowEN · ES · 中文

The work

Heavy industrial construction: foundations and industrial slabs, structural steel erection, insulated wall and roof panels, heavy concrete paving, underground utilities and MEP coordination. Work is performed under US codes and owner audit standards.

Why CTECP INC

A global design-build contractor's first U.S. team — small, senior and hands-on.

A contractor, not an agency

You join the contractor's own team and payroll — not a staffing agency bench.

Steel, concrete, envelope

Heavy industrial work that builds your résumé: tall steel frames, mezzanines, big slabs, heavy paving.

Global backing, local team

CTECP has delivered 250+ industrial projects in 9 countries since 2016. CTECP INC (Katy, TX, est. 2024) brings that experience to the Gulf Coast.

Safety and compliance first

OSHA-driven site, licensed trades only, 100% documented workforce. We build the way owners audit.

Openings

Three groups: the project team (salaried), field crews (hourly) and licensed subcontractor packages. Open any card for the full description.

Project team · salaried

Site Safety Manager (HSE)

Full-time · United States · project site

Own safety on a steel-erection and heavy-concrete site under a zero-tolerance owner: fall protection, crane and rigging, excavation, hot work and confined space.

Field crews · hourly

Steel Erection Foreman

Full-time · hourly · United States · project site

Lead an ironworker crew erecting structural steel frames with mezzanine levels, bracing and purlins — plumb, bolted, welded and inspected.

Licensed subcontractor packages

How to apply

Email your résumé (and licenses/certifications for trades) with the role name in the subject line. Spanish- and Mandarin-speaking candidates welcome — write in the language you prefer. We answer every application within 5 business days.

Subcontractors: send a one-page capability statement, license numbers, insurance limits and three industrial references. We will reply with drawings and a bid form.

CTECP INC · 611 Choctaw Ln, Suite E, Katy, TX 77494
Work locations: United States (assigned by project)

Pay: competitive, based on experience. Hourly roles: overtime per FLSA; PPE provided.

Openings are tied to project schedules and may be contingent on contract award; we are interviewing now.

CTECP INC is an equal opportunity employer. All qualified applicants receive consideration without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability or veteran status. Applicants must be authorized to work in the United States; we complete Form I-9 for every hire. Visa sponsorship is not available for these positions. Pre-employment drug screening and background checks may be required by project-site rules.