CTECP
Project team · salaried

Estimator / Preconstruction Engineer — Industrial

Full-timeUnited States · officeStart: Rolling — interviewing now

About the role

Price US industrial work in US units with real U.S.-market subcontractor and material costs — and build the bid packages that win the next phases.

What you'll do

  • Prepare quantity take-offs and unit-price estimates for civil, concrete, structural steel erection, envelope and MEP packages.
  • Source and level subcontractor and supplier quotes (licensed electrical, mechanical, plumbing, paving, coatings).
  • Convert metric design packages into US-unit bid formats; flag scope gaps and draft RFIs.
  • Support change-order pricing and cost tracking during construction.

What you bring

  • 4+ years estimating commercial/industrial construction in Texas; a working U.S. subcontractor network.
  • Bluebeam or On-Screen Takeoff and advanced Excel; familiar with RSMeans and local pricing.
  • Degree in construction or engineering, or equivalent; authorized to work in the US.

Nice to have

  • Mandarin (owner packages are often bilingual).
  • Steel erection or concrete self-perform background.
Pay: competitive, based on experience. Hourly roles: overtime per FLSA; PPE provided.
Openings are tied to project schedules and may be contingent on contract award; we are interviewing now.

CTECP INC is an equal opportunity employer. All qualified applicants receive consideration without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability or veteran status. Applicants must be authorized to work in the United States; we complete Form I-9 for every hire. Visa sponsorship is not available for these positions. Pre-employment drug screening and background checks may be required by project-site rules.

Project team · salaried