CTECP
Project team · salaried

Site Superintendent — Structural Steel & Concrete

Full-timeUnited States · project siteStart: Rolling — interviewing now

About the role

Run the field: foundations and slabs, structural steel erection with mezzanine levels, wall and roof panels and heavy paving — safely, in sequence, on schedule.

What you'll do

  • Direct daily site operations, crews and subcontractors; set the three-week look-ahead and hold every trade to it.
  • Plan crane picks, steel laydown and the erection sequence with the erection foreman; verify anchor bolts, embeds and elevations before every pour.
  • Enforce site safety (fall protection at height, crane and rigging, excavation) and quality checkpoints together with the Safety Manager and QA/QC.
  • Coordinate city, owner and third-party inspections; keep daily logs, photos and manpower reports.
  • Receive and check owner-furnished materials; manage deliveries, laydown and temporary facilities.

What you bring

  • 7+ years supervising industrial or structural-steel building construction, 3+ years as superintendent.
  • Proven experience erecting structural steel and placing heavy slabs and foundations; reads structural and MEP drawings.
  • OSHA 30; valid driver's license; authorized to work in the US.
  • Bilingual English/Spanish strongly preferred for crew communication.

Nice to have

  • Rigger/signal person certification.
  • Procore or similar.
  • Pre-engineered metal building experience.
Pay: competitive, based on experience. Hourly roles: overtime per FLSA; PPE provided.
Openings are tied to project schedules and may be contingent on contract award; we are interviewing now.

CTECP INC is an equal opportunity employer. All qualified applicants receive consideration without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability or veteran status. Applicants must be authorized to work in the United States; we complete Form I-9 for every hire. Visa sponsorship is not available for these positions. Pre-employment drug screening and background checks may be required by project-site rules.

Project team · salaried