CTECP
Project team · salaried

QA/QC Inspector — Concrete & Structural Steel

Full-timeUnited States · project siteStart: Rolling — interviewing now

About the role

Verify that foundations, slabs, bolted and welded steel connections and the building envelope are built to drawings, specifications and code — and document it.

What you'll do

  • Implement the inspection and test plan: pre-pour rebar/embed checks, concrete sampling coordination, anchor-bolt surveys, bolt tensioning and weld inspection.
  • Coordinate the third-party testing lab and the special inspections required by the permit.
  • Keep non-conformance reports, punch lists, test reports and turnover documentation current.
  • Review subcontractor QC and material certifications (steel, bolts, coatings, concrete mixes).

What you bring

  • 4+ years construction QA/QC on industrial or steel-framed buildings.
  • Working knowledge of ACI, AISC/RCSC bolting and AWS D1.1; CWI or ICC Reinforced Concrete / Structural Steel certifications strongly preferred.
  • Strong documentation habits; authorized to work in the US.

Nice to have

  • Bilingual English/Spanish or English/Mandarin.
Pay: competitive, based on experience. Hourly roles: overtime per FLSA; PPE provided.
Openings are tied to project schedules and may be contingent on contract award; we are interviewing now.

CTECP INC is an equal opportunity employer. All qualified applicants receive consideration without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability or veteran status. Applicants must be authorized to work in the United States; we complete Form I-9 for every hire. Visa sponsorship is not available for these positions. Pre-employment drug screening and background checks may be required by project-site rules.

Project team · salaried