CTECP
Licensed subcontractor packages

Concrete Paving & Site Utilities Subcontractor

Subcontract packageUnited States · project siteStart: Rolling — interviewing now

About the role

Heavy reinforced concrete pavement on stabilized base, curb, underground conduit and water lines — phased around operating sites.

Scope

  • Subgrade preparation, 8-inch stabilized base, 7-inch reinforced pavement, joints, curbs and tie-ins to existing roads.
  • Trenching and backfill for conduit and water lines; restoration of hardscape and landscape.
  • Work in phases with traffic control on an active industrial site.

Qualifications to bid

  • Own paving crews and equipment (paver or laser screed preferred); insurance in place.
  • Experience phasing work on active industrial sites in the United States.
  • Available on short notice.

CTECP INC is an equal opportunity employer. All qualified applicants receive consideration without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability or veteran status. Applicants must be authorized to work in the United States; we complete Form I-9 for every hire. Visa sponsorship is not available for these positions. Pre-employment drug screening and background checks may be required by project-site rules.

Licensed subcontractor packages