CTECP
Licensed subcontractor packages

Licensed Mechanical / HVAC (TACLA) & Plumbing (TSBPE) Contractors

Subcontract packageUnited States · project siteStart: Rolling — interviewing now

About the role

Subcontract packages: ventilation and HVAC for industrial buildings; process-water and wastewater piping (CPVC and C900 PVC), domestic water and sanitary — permits under your own license.

Scope

  • HVAC and ventilation equipment, ductwork and controls for industrial buildings.
  • Process and wastewater piping (CPVC, C900), water meters, backflow preventers, valve vaults; domestic water and sanitary.
  • Apply for mechanical/plumbing permits and inspections in your own name.

Qualifications to bid

  • Active TACLA (mechanical) and/or TSBPE (plumbing) contractor licenses; insurance in place.
  • Industrial references in the United States; U.S.-based.
  • Able to start on short notice.

CTECP INC is an equal opportunity employer. All qualified applicants receive consideration without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability or veteran status. Applicants must be authorized to work in the United States; we complete Form I-9 for every hire. Visa sponsorship is not available for these positions. Pre-employment drug screening and background checks may be required by project-site rules.

Licensed subcontractor packages