CTECP
Licensed subcontractor packages

Licensed Electrical Contractor (TDLR) — Industrial Buildings

Subcontract packageUnited States · project siteStart: Rolling — interviewing now

About the role

Subcontract package: power distribution, lighting, grounding, underground duct banks and equipment connections for new industrial buildings — permits pulled under your own TDLR electrical contractor license.

Scope

  • Service entrance, switchgear and panelboards, feeders, branch circuits, lighting and grounding/bonding per NEC.
  • Underground PVC duct banks (~3,800 ft) and pull boxes; connections to owner-furnished equipment.
  • Apply for city electrical permits and schedule inspections in your own name; provide the licensed engineer/master electrician of record.

Qualifications to bid

  • Active TDLR Electrical Contractor license with a Master Electrician of record; general liability and workers' compensation insurance.
  • Industrial or manufacturing references in the United States within the last 3 years.
  • Able to start on short notice.

CTECP INC is an equal opportunity employer. All qualified applicants receive consideration without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, disability or veteran status. Applicants must be authorized to work in the United States; we complete Form I-9 for every hire. Visa sponsorship is not available for these positions. Pre-employment drug screening and background checks may be required by project-site rules.

Licensed subcontractor packages